DDK OS

Roadmap / Execution Board

Read-only V1 board backed by data/roadmap-board.json. No drag-and-drop, edit controls, execution triggers, or Supabase calls.

Last updated: 2026-04-30T17:54:10Z
35 total cards
5 active / gated
14 approval required
9 blocked or awaiting

Backlog

11
DDK-INFRA-001
Infrastructure · Backlog
Approval: Yes

Root Host Nginx 502

Owner
CTO
Status
Backlog / accepted known issue
Priority: Low unless we intend the root host to serve DDK OS.Risk: low
Next action

Leave untouched unless the root host is intentionally assigned to serve DDK OS.

Blocker status

Not blocking DDK OS because https://os.srv1374269.hstgr.cloud/roadmap works.

Approval gate

Sherman approval required before nginx config changes, service restarts, port changes, or root-host routing changes.

Source refs
  • https://os.srv1374269.hstgr.cloud/roadmap
  • https://srv1374269.hstgr.cloud/roadmap
P0F-001
Phase 0 · Phase 0F
Approval: No

Payload validation fixtures and transform test skeleton

Owner
CTO / CQO
Status
Backlog / sequenced after event audit decisions
Priority: mediumRisk: medium
Next action

Create redacted fixture plan for GHL, Stripe, and Meta transforms; keep tests read-only and secret-safe.

Blocker status

Awaiting Phase 0D/0E decisions

Approval gate

Sherman approval needed only if new packages, replay harness writes, or production fixtures are requested.

Source refs
  • specs/phase-0-data-foundation-plan.md#workstream-e--payload-validation-and-fixtures
  • specs/testing-and-qa-plan.md
P0G-001
Phase 0 · Phase 0G
Approval: Yes

Stripe/payment idempotency and unmatched handling

Owner
CTO / CSO / CQO
Status
Backlog / reliability hardening not started
Priority: mediumRisk: high
Next action

Verify production Stripe event delivery, uniqueness anchors, duplicate handling, and unmatched-payment reconciliation path.

Blocker status

Requires careful CSO/CQO review before any payment-path write changes

Approval gate

Sherman approval required before production payment handler writes or schema changes.

Source refs
  • specs/phase-0-data-foundation-plan.md#workstream-f--stripe-payment-reliability
P0H-001
Phase 0 · Phase 0H
Approval: No

Meta sync reliability and partial-sync visibility

Owner
CTO / CMO / CQO
Status
Backlog / health classification pending
Priority: mediumRisk: medium
Next action

Classify recurring 403 service failures and define dashboard/API behavior for partial sync data.

Blocker status

Awaiting Phase 0C and reporting contract alignment

Approval gate

Sherman approval required before changing sync behavior, mappings, or production schedules.

Source refs
  • specs/phase-0-data-foundation-plan.md#workstream-g--meta-sync-reliability
  • reports/phase-0/mapping-health-baseline-2026-04-28.md
P1-QA-001
Phase 1 · Testing / QA
Approval: Yes

Playwright/e2e implementation checklist

Owner
CTO / CQO
Status
Backlog / approved in principle, install deferred
Priority: mediumRisk: medium
Next action

Prepare checklist and request approval before package install; first tests should cover /dashboard and read-only API smoke behavior.

Blocker status

No package additions approved for current V1 board task

Approval gate

Sherman approval required before installing Playwright or adding test dependencies.

Source refs
  • specs/testing-and-qa-plan.md
  • specs/ddk-os-engineering-framework.md#7-qa-gates
P2-001
Phase 2 · Data Contracts / Supabase Accuracy
Approval: Yes

Stable reporting contracts and validation surface

Owner
CTO / CQO
Status
High-level backlog
Priority: mediumRisk: medium
Next action

Convert Phase 0 contract decisions into durable module contracts and validation routines.

Blocker status

Depends on Phase 0 closure and Phase 1 module cleanup sequence

Approval gate

Sherman approval required for schema/reporting-contract changes.

Source refs
  • specs/ddk-os-engineering-framework.md#3-module-architecture
P3-001
Phase 3 · UX / Operating Dashboard
Approval: Yes

Usability, filters, saved views, and state handling

Owner
CTO / CMO / CQO
Status
High-level backlog
Priority: mediumRisk: medium
Next action

Define UX scope after core Media Buying data contract is reliable.

Blocker status

Depends on Phase 1-2 foundations

Approval gate

Sherman approval required before major product UX expansion.

Source refs
  • specs/ddk-os-engineering-framework.md#3-module-architecture
P4-001
Phase 4 · Client Ops
Approval: Yes

Client status, onboarding, services, and account health module

Owner
CTO / CMO / CQO
Status
High-level backlog
Priority: mediumRisk: medium
Next action

Scope after Media Buying and data contracts stabilize.

Blocker status

Not started

Approval gate

Sherman approval required before new module build.

Source refs
  • specs/ddk-os-engineering-framework.md#3-module-architecture
P5-001
Phase 5 · Creative / Offers
Approval: Yes

Creative inventory, approvals, and asset performance module

Owner
CTO / CMO / CQO
Status
High-level backlog
Priority: lowRisk: medium
Next action

Define after campaign performance and client ops workflows are stable.

Blocker status

Not started

Approval gate

Sherman approval required before new module build.

Source refs
  • specs/ddk-os-engineering-framework.md#3-module-architecture
P6-001
Phase 6 · Sales / Appointments
Approval: Yes

Leads, booked calls, appointment quality, and pipeline visibility

Owner
CTO / CMO / CQO
Status
High-level backlog
Priority: lowRisk: medium
Next action

Scope once lead/appointment data contracts and attribution paths are validated.

Blocker status

Not started

Approval gate

Sherman approval required before new module build.

Source refs
  • specs/ddk-os-engineering-framework.md#3-module-architecture
P7-001
Phase 7 · Executive Overview
Approval: Yes

Business-level reporting and cross-module summaries

Owner
CTO / CEO / CQO
Status
High-level backlog
Priority: lowRisk: medium
Next action

Aggregate only after lower-level modules have reliable source contracts and QA coverage.

Blocker status

Not started

Approval gate

Sherman approval required before executive reporting module build.

Source refs
  • specs/ddk-os-engineering-framework.md#3-module-architecture

Ready

3
DB-SAFE-001
Controls · DB-sensitive workstream guardrail
Approval: No

Force read-only DB mode unless scoped WRITE_APPROVED=true token exists

Owner
CTO / CSO / CQO
Status
Required before next DB-sensitive workstream
Priority: highRisk: high
Next action

Implement and validate the guardrail before Phase 0E or any other DB-sensitive workstream begins.

Blocker status

Blocks next DB-sensitive workstream until implemented/validated.

Approval gate

No DB writes implied by this control card. Sherman approval remains required for any actual DDL/DML, production write, migration, deploy, or Phase 0E activation.

Source refs
  • docs/ddk-os-files/phase-0d-closure-note-2026-04-30.md
P1-MB-001
Phase 1 · Media Buying / Campaign Performance
Approval: Yes

Media Buying module cleanup and API contract lock

Owner
CTO / CMO / CQO
Status
Ready after Phase 0 gates; current active module remains /dashboard
Priority: highRisk: medium
Next action

Start with MB-0 baseline, then extract API logic, normalize metrics, split UI components, document Supabase contracts, and run QA pass.

Blocker status

Blocked from expansion until Phase 0 reliability gates pass

Approval gate

Sherman approval required before broader UI/API refactors or reporting view changes.

Source refs
  • specs/media-buying-module-plan.md
  • specs/ddk-os-engineering-framework.md#3-module-architecture
OPENCLAW-BUILDMODE-001
OpenClaw Stability · Codex CTO Build Mode
Approval: Yes

Codex CTO Build Mode safe operating rule

Owner
CTO / CQO / Dan
Status
Ready with restrictions / isolated worktree implementation tasks only
Priority: highRisk: high
Next action

Use only for scoped repo implementation tasks in isolated worktrees. Route every Build Mode task with explicit scope, worktree path, expected diff/artifact, and review gate.

Blocker status

Not blocked for isolated worktree implementation tasks; blocked for production workspace writes, runtime/config/deploy/security-sensitive work, and ACP/acpx.

Approval gate

CQO validation required before merge. Sherman approval required before merge, deploy, live writes, or any Tier 3 work. CSO required for secrets/auth/security-sensitive scope.

Source refs
  • proposals/OPENCLAW-CTO-001-codex-harness-build-mode.md
  • standards/cto-build-mode.md
  • standards/session-lifecycle.md

In Progress

0
No cards in this column.

CTO Review

0
No cards in this column.

CQO Validation

0
No cards in this column.

CSO Gate

1
OPENCLAW-ACP-001
OpenClaw Stability · ACP/acpx
Approval: Yes

ACP/acpx backend validation and enablement

Owner
CTO / CSO
Status
Blocked / ACP-acpx disabled and off-limits
Priority: highRisk: high
Next action

Do not enable or route through ACP/acpx. If revisited, start with an explicit CSO-gated validation plan and isolated non-production test.

Blocker status

Blocked: ACP/acpx is disabled/off-limits and not approved for runtime use.

Approval gate

CSO + Sherman approval required before enabling ACP/acpx, changing plugin-runtime-deps, or using ACP/acpx in production/runtime routing.

Source refs
  • logs/openclaw-acpx-package-install-verification-20260429T1713.md
  • logs/openclaw-cto-002-isolated-acp-functional-validation-20260429T1746.md

Needs User Approval

1
P0E-001
Phase 0 · Phase 0E
Approval: Yes

Webhook/event audit rollout planning

Owner
CTO / CSO / CQO
Status
WP1 complete; WP2 rollout planning needs approval
Priority: highRisk: high
Next action

Ask Sherman to approve WP2 bounded technical planning for broader metadata-only webhook/event audit rollout across remaining webhook/event surfaces; keep no-raw-payload standard and scope future production writes through DB-SAFE-001.

Blocker status

WP1 closed. WP2 awaits Sherman approval before broader handler changes, schema changes, production writes, or rollout execution.

Approval gate

Sherman approval required before WP2 implementation, additional handler audit writes, schema changes, migrations, production writes, or any raw payload/body/header/token/customer/contact/plaintext PII storage.

Source refs
  • specs/phase-0-data-foundation-plan.md#workstream-d--webhookevent-audit-design
  • public.webhook_events
  • P0E-WP1 / DB-SAFE-001

Done

17
P0A-001
Phase 0 · Phase 0A
Approval: No

Mapping health baseline and repeatable report

Owner
CTO
Status
Done / baseline report implemented
Priority: highRisk: low
Next action

Use baseline as reference for later Phase 0 validation and regression checks.

Blocker status

Closed

Approval gate

No active approval gate; future data writes still require separate approval.

Source refs
  • reports/phase-0/mapping-health-baseline-2026-04-28.md
  • scripts/reports/phase0-mapping-health.js
  • specs/sql/phase0-mapping-health-validation.sql
P0B-001
Phase 0 · Phase 0B
Approval: No

Parser blank-only backfill closure

Owner
CTO / CQO
Status
Done / closed after blank-only backfill and CQO validation
Priority: highRisk: low
Next action

Keep closure docs as the durable record; do not reopen unless a new parser defect is approved as separate work.

Blocker status

Closed

Approval gate

Closed; any future parser writes require separate Sherman approval.

Source refs
  • specs/phase-0-data-foundation-plan.md#19-phase-0b-parser-backfill-closure--complete
  • specs/phase-0-backlog.md
  • reports/phase-0/phase-0b-parser-backfill-apply-2026-04-29T14-52-52-175Z.md
P0C-001
Phase 0 · Phase 0C
Approval: No

Service type standardization implementation/local validation

Owner
CTO
Status
Done / closed
Priority: highRisk: low
Next action

Use Phase 0C closure as the baseline for the next Phase 0 workstream; any future production write or schema change remains separately gated.

Blocker status

Closed

Approval gate

Closed; separate Sherman approval required for any future deploy, production data write, or schema change.

Source refs
  • reports/phase-0/phase-0c-service-type-readonly-inspection-2026-04-29T15-10-00Z.md
  • specs/phase-0-data-foundation-plan.md#workstream-b--service-type-standardization
ROADMAP-001
Phase 0 · DDK-OPS-BOARD-V1
Approval: No

Read-only roadmap execution board V1

Owner
CTO / CQO
Status
Done / Roadmap Board V1 complete
Priority: highRisk: low
Next action

Preserve V1 scope as a read-only board backed by data/roadmap-board.json; future enhancements should be separate backlog cards.

Blocker status

Closed

Approval gate

Closed for V1; no Supabase calls, schema changes, or execution triggers are included in this scope.

Source refs
  • specs/roadmap-execution-board-v1-plan.md
  • data/roadmap-board.json
  • /home/dan/.openclaw/workspace/wiki/projects/ddk-os.md
P0D-001
Phase 0 · Phase 0D
Approval: No

Supabase data contract for Media Buying and identity joins

Owner
CTO / CQO
Status
Done / Phase 0D functionally complete; CQO PASS accepted
Priority: highRisk: medium
Next action

Preserve closure evidence as durable record. Before Phase 0E or any DB-sensitive workstream, complete DB-SAFE-001 read-only/write-token guardrail.

Blocker status

Closed; no rollback needed. Phase 0E remains not approved.

Approval gate

Phase 0D closure accepted. Phase 0E and any future deploy, schema change, migration, production write, dashboard/API implementation, or DB-sensitive write remain separately gated.

Source refs
  • docs/ddk-os-files/phase-0d-supabase-data-contract-2026-04-29.md
  • docs/ddk-os-files/phase-0d-validation-checklist-2026-04-29.md
  • specs/phase-0-data-foundation-plan.md#workstream-a--supabase-contract-lock
  • specs/media-buying-module-plan.md#4-data-contract-draft
  • docs/ddk-os-files/phase-0d-closure-note-2026-04-30.md
  • docs/ddk-os-files/phase-0d-validation-evidence-2026-04-30/phase-0d-closure-cqo-evidence.md
  • docs/ddk-os-files/phase-0d-validation-evidence-2026-04-30/phase-0d-closure-validation.json
P0E-WP1
Phase 0 · Phase 0E WP1
Approval: No

Metadata-only webhook/event audit foundation

Owner
CTO / CSO / CQO
Status
Done / WP1 closed; CSO APPROVED and CQO PASS
Priority: highRisk: high
Next action

Use WP1 as the safe baseline for WP2 planning; keep future production writes scoped through DB-SAFE-001 and preserve no-raw-payload audit storage.

Blocker status

Closed

Approval gate

WP1 closed. Separate Sherman approval required before WP2 implementation, new handler writes, schema changes, migrations, production writes, or raw payload storage.

Source refs
  • public.webhook_events
  • P0E-WP1 / DB-SAFE-001
  • client-won / client-onboarded / ghl-payment handlers
P0D-FU-001
Phase 0 · Phase 0D validation/follow-up
Approval: No

Live-column exports for Meta sync/mapping tables

Owner
CTO / CQO
Status
Done / accepted in Phase 0D closure evidence
Priority: highRisk: medium
Next action

No active Phase 0D action. Retain evidence; route any future changes as a separately approved workstream after DB-SAFE-001.

Blocker status

Closed by accepted Phase 0D CQO PASS; not an active Phase 0D blocker.

Approval gate

Closed for Phase 0D. Separate approval still required before any future production write, migration, deploy, schema change, dashboard/API implementation, or Phase 0E activation.

Source refs
  • docs/ddk-os-files/phase-0d-supabase-data-contract-2026-04-29.md#phase-1-blockersgates
  • docs/ddk-os-files/phase-0d-validation-checklist-2026-04-29.md
  • docs/ddk-os-files/phase-0d-closure-note-2026-04-30.md
  • docs/ddk-os-files/phase-0d-validation-evidence-2026-04-30/phase-0d-closure-cqo-evidence.md
  • docs/ddk-os-files/phase-0d-validation-evidence-2026-04-30/phase-0d-closure-validation.json
P0D-FU-002
Phase 0 · Phase 0D validation/follow-up
Approval: No

Meta campaign mapping uniqueness enforcement

Owner
CTO / CQO
Status
Done / accepted in Phase 0D closure evidence
Priority: highRisk: medium
Next action

No active Phase 0D action. Retain evidence; route any future changes as a separately approved workstream after DB-SAFE-001.

Blocker status

Closed by accepted Phase 0D CQO PASS; not an active Phase 0D blocker.

Approval gate

Closed for Phase 0D. Separate approval still required before any future production write, migration, deploy, schema change, dashboard/API implementation, or Phase 0E activation.

Source refs
  • docs/ddk-os-files/phase-0d-supabase-data-contract-2026-04-29.md#phase-1-blockersgates
  • docs/ddk-os-files/phase-0d-validation-checklist-2026-04-29.md
  • docs/ddk-os-files/phase-0d-closure-note-2026-04-30.md
  • docs/ddk-os-files/phase-0d-validation-evidence-2026-04-30/phase-0d-closure-cqo-evidence.md
  • docs/ddk-os-files/phase-0d-validation-evidence-2026-04-30/phase-0d-closure-validation.json
P0D-FU-003
Phase 0 · Phase 0D validation/follow-up
Approval: No

Payment revenue recognition basis

Owner
CTO / CQO
Status
Done / accepted in Phase 0D closure evidence
Priority: highRisk: high
Next action

No active Phase 0D action. Retain evidence; route any future changes as a separately approved workstream after DB-SAFE-001.

Blocker status

Closed by accepted Phase 0D CQO PASS; not an active Phase 0D blocker.

Approval gate

Closed for Phase 0D. Separate approval still required before any future production write, migration, deploy, schema change, dashboard/API implementation, or Phase 0E activation.

Source refs
  • docs/ddk-os-files/phase-0d-supabase-data-contract-2026-04-29.md#phase-1-blockersgates
  • docs/ddk-os-files/phase-0d-validation-checklist-2026-04-29.md
  • docs/ddk-os-files/phase-0d-closure-note-2026-04-30.md
  • docs/ddk-os-files/phase-0d-validation-evidence-2026-04-30/phase-0d-closure-cqo-evidence.md
  • docs/ddk-os-files/phase-0d-validation-evidence-2026-04-30/phase-0d-closure-validation.json
P0D-FU-004
Phase 0 · Phase 0D validation/follow-up
Approval: No

Appointment status/outcome pollution resolution

Owner
CTO / CQO
Status
Done / accepted in Phase 0D closure evidence
Priority: highRisk: high
Next action

No active Phase 0D action. Retain evidence; route any future changes as a separately approved workstream after DB-SAFE-001.

Blocker status

Closed by accepted Phase 0D CQO PASS; not an active Phase 0D blocker.

Approval gate

Closed for Phase 0D. Separate approval still required before any future production write, migration, deploy, schema change, dashboard/API implementation, or Phase 0E activation.

Source refs
  • docs/ddk-os-files/phase-0d-supabase-data-contract-2026-04-29.md#phase-1-blockersgates
  • docs/ddk-os-files/phase-0d-validation-checklist-2026-04-29.md
  • docs/ddk-os-files/phase-0d-closure-note-2026-04-30.md
  • docs/ddk-os-files/phase-0d-validation-evidence-2026-04-30/phase-0d-closure-cqo-evidence.md
  • docs/ddk-os-files/phase-0d-validation-evidence-2026-04-30/phase-0d-closure-validation.json
P0D-FU-005
Phase 0 · Phase 0D validation/follow-up
Approval: No

Canonical join validation

Owner
CTO / CQO
Status
Done / accepted in Phase 0D closure evidence
Priority: highRisk: medium
Next action

No active Phase 0D action. Retain evidence; route any future changes as a separately approved workstream after DB-SAFE-001.

Blocker status

Closed by accepted Phase 0D CQO PASS; not an active Phase 0D blocker.

Approval gate

Closed for Phase 0D. Separate approval still required before any future production write, migration, deploy, schema change, dashboard/API implementation, or Phase 0E activation.

Source refs
  • docs/ddk-os-files/phase-0d-supabase-data-contract-2026-04-29.md#phase-1-blockersgates
  • docs/ddk-os-files/phase-0d-validation-checklist-2026-04-29.md
  • docs/ddk-os-files/phase-0d-closure-note-2026-04-30.md
  • docs/ddk-os-files/phase-0d-validation-evidence-2026-04-30/phase-0d-closure-cqo-evidence.md
  • docs/ddk-os-files/phase-0d-validation-evidence-2026-04-30/phase-0d-closure-validation.json
P0D-FU-006
Phase 0 · Phase 0D validation/follow-up
Approval: No

Null/orphan/duplicate handling validation

Owner
CTO / CQO
Status
Done / accepted in Phase 0D closure evidence
Priority: highRisk: medium
Next action

No active Phase 0D action. Retain evidence; route any future changes as a separately approved workstream after DB-SAFE-001.

Blocker status

Closed by accepted Phase 0D CQO PASS; not an active Phase 0D blocker.

Approval gate

Closed for Phase 0D. Separate approval still required before any future production write, migration, deploy, schema change, dashboard/API implementation, or Phase 0E activation.

Source refs
  • docs/ddk-os-files/phase-0d-supabase-data-contract-2026-04-29.md#phase-1-blockersgates
  • docs/ddk-os-files/phase-0d-validation-checklist-2026-04-29.md
  • docs/ddk-os-files/phase-0d-corrected-write-plan-2026-04-29.md
  • docs/ddk-os-files/phase-0d-closure-note-2026-04-30.md
  • docs/ddk-os-files/phase-0d-validation-evidence-2026-04-30/phase-0d-closure-cqo-evidence.md
  • docs/ddk-os-files/phase-0d-validation-evidence-2026-04-30/phase-0d-closure-validation.json
P0D-FU-007
Phase 0 · Phase 0D validation/follow-up
Approval: No

Campaign-mode mapping validation

Owner
CTO / CQO
Status
Done / accepted in Phase 0D closure evidence
Priority: highRisk: medium
Next action

No active Phase 0D action. Retain evidence; route any future changes as a separately approved workstream after DB-SAFE-001.

Blocker status

Closed by accepted Phase 0D CQO PASS; not an active Phase 0D blocker.

Approval gate

Closed for Phase 0D. Separate approval still required before any future production write, migration, deploy, schema change, dashboard/API implementation, or Phase 0E activation.

Source refs
  • docs/ddk-os-files/phase-0d-supabase-data-contract-2026-04-29.md#phase-1-blockersgates
  • docs/ddk-os-files/phase-0d-validation-checklist-2026-04-29.md
  • docs/ddk-os-files/phase-0d-closure-note-2026-04-30.md
  • docs/ddk-os-files/phase-0d-validation-evidence-2026-04-30/phase-0d-closure-cqo-evidence.md
  • docs/ddk-os-files/phase-0d-validation-evidence-2026-04-30/phase-0d-closure-validation.json
P0D-FU-008
Phase 0 · Phase 0D validation/follow-up
Approval: No

Mock-data validation pass

Owner
CTO / CQO
Status
Done / accepted in Phase 0D closure evidence
Priority: highRisk: medium
Next action

No active Phase 0D action. Retain evidence; route any future changes as a separately approved workstream after DB-SAFE-001.

Blocker status

Closed by accepted Phase 0D CQO PASS; not an active Phase 0D blocker.

Approval gate

Closed for Phase 0D. Separate approval still required before any future production write, migration, deploy, schema change, dashboard/API implementation, or Phase 0E activation.

Source refs
  • docs/ddk-os-files/phase-0d-supabase-data-contract-2026-04-29.md#phase-1-blockersgates
  • docs/ddk-os-files/phase-0d-validation-checklist-2026-04-29.md
  • docs/ddk-os-files/phase-0d-closure-note-2026-04-30.md
  • docs/ddk-os-files/phase-0d-validation-evidence-2026-04-30/phase-0d-closure-cqo-evidence.md
  • docs/ddk-os-files/phase-0d-validation-evidence-2026-04-30/phase-0d-closure-validation.json
P0D-FU-009
Phase 0 · Phase 0D validation/follow-up
Approval: No

CQO Phase 0D checklist 100% pass

Owner
CTO / CQO
Status
Done / accepted in Phase 0D closure evidence
Priority: highRisk: medium
Next action

No active Phase 0D action. Retain evidence; route any future changes as a separately approved workstream after DB-SAFE-001.

Blocker status

Closed by accepted Phase 0D CQO PASS; not an active Phase 0D blocker.

Approval gate

Closed for Phase 0D. Separate approval still required before any future production write, migration, deploy, schema change, dashboard/API implementation, or Phase 0E activation.

Source refs
  • docs/ddk-os-files/phase-0d-supabase-data-contract-2026-04-29.md#phase-1-blockersgates
  • docs/ddk-os-files/phase-0d-validation-checklist-2026-04-29.md
  • docs/ddk-os-files/phase-0d-closure-note-2026-04-30.md
  • docs/ddk-os-files/phase-0d-validation-evidence-2026-04-30/phase-0d-closure-cqo-evidence.md
  • docs/ddk-os-files/phase-0d-validation-evidence-2026-04-30/phase-0d-closure-validation.json
OPENCLAW-STAB-001
OpenClaw Stability · Gateway / Discord
Approval: No

Gateway stability and Discord connectivity

Owner
CTO
Status
Done / gateway stable and reachable; Discord connected
Priority: highRisk: medium
Next action

Monitor gateway reachability, running-task drain, and CPU return-to-idle during future CTO/Codex sessions.

Blocker status

Closed for current connectivity baseline; reopen only if gateway or Discord routing regresses.

Approval gate

No active gate for status tracking. Any gateway, Discord routing, systemd, nginx, or runtime config change still requires separate approval.

Source refs
  • wiki/projects/ddk-os.md#operating-note--cto-discord-channel
  • runtime-manifest.md
OPENCLAW-CODEX-001
OpenClaw Stability · Native Codex
Approval: No

Native Codex app-server and CLI smoke validation

Owner
CTO / CSO
Status
Done / native app-server smoke passed; direct Codex CLI works with GPT-5.5
Priority: highRisk: medium
Next action

Keep Codex usage confined to approved Build Mode boundaries; do not treat smoke-test success as production write approval.

Blocker status

Closed for native app-server/CLI smoke only; production workspace writes and sensitive runtime/config work remain blocked.

Approval gate

No additional approval for completed smoke-test tracking. Separate Sherman approval required before merge/deploy/live writes; CSO gate required for sensitive areas.

Source refs
  • handoffs/2026-04-29/OPENCLAW-CTO-003-native-codex-app-server-discovery-handoff.md
  • handoffs/2026-04-29/OPENCLAW-CTO-003-native-codex-smoke-test-handoff.md
  • handoffs/restricted/2026-04-29/OPENCLAW-CTO-003-native-codex-smoke-cso-gate-handoff.md

Follow-up / Watchlist

2
P0-FU-001
Phase 0 · Follow-up
Approval: No

Review 9 newly classified unparsed entries

Owner
CTO / CQO
Status
Watchlist / explicitly not a Phase 0B blocker
Priority: lowRisk: low
Next action

Review later for possible reusable parser refinements if the pattern recurs.

Blocker status

No active blocker

Approval gate

Separate approval required only if future parser changes/write backfill are proposed.

Source refs
  • specs/phase-0-backlog.md#follow-up-backlog
  • specs/phase-0-data-foundation-plan.md#follow-up-not-a-phase-0b-blocker
OPENCLAW-SANDBOX-001
OpenClaw Stability · Sandbox / Worktree Guardrails
Approval: Yes

Workspace-write sandbox failure and danger-full-access guardrails

Owner
CTO / CSO / CQO
Status
Blocked for workspace-write / safe fallback is isolated worktree plus process boundaries
Priority: highRisk: high
Next action

Treat workspace-write as unavailable on this VPS. Keep danger-full-access confined to isolated worktrees and forbid production workspace writes, OpenClaw runtime/config changes, plugin-runtime-deps changes, secrets/auth files, Supabase production writes, schema migrations, Stripe/GHL/Meta config, webhook replay, nginx/systemd, deploys/restarts, and destructive cleanup.

Blocker status

Blocked: workspace-write sandbox unavailable due VPS namespace/Bubblewrap restrictions; production workspace writes not approved.

Approval gate

Sherman approval required before any production write/merge/deploy/live write. CSO required for runtime/config/security-sensitive work. CQO validation required before merge.

Source refs
  • handoffs/restricted/2026-04-29/OPENCLAW-CTO-runtime-codex-ENOENT-readonly-audit-handoff.md
  • proposals/OPENCLAW-CTO-001-codex-harness-build-mode.md
  • standards/cto-build-mode.md